Prevention
| Solution |
|---|
|
Ensure a three years delay between two cabbages crops
|
|
Limit cruciferous weeds in crops
|
|
Limit sprinkler irrigation
|
|
Use of treated seeds
|
|
Incorporate crop residues in the soil
|
Control
Regulations surrounding biological products can change rapidly – always verify products recommended here with the most recent legislation and lists of products registered for your country
| Solution | Max nb. of a. i. application/year | Application Details and Notes (commercial product example) |
|---|---|---|
|
Bacillus amyloliquefaciens souche FZB24
|
12
|
TAEGRO , dosage: 0.37 kg/ha
|
Regulations surrounding chemical products can change rapidly – always verify chemicals recommended here with the most recent legislation and lists of products registered for your country
| Solution | Product Category | Max nb. of a. i. application/year | Application Details and Notes (commercial product example) | Chemical Group |
|---|---|---|---|---|
|
See Phytoweb (link in sources) for the most up to date information on chemical products
|
|
|
|
|
|
Azoxystrobin
|
Synthetic fungicide
|
2
|
AZBANY, dosage: 1 L/ha. 10 m buffer zone from surface water using conventional techniques.
|
QoI-fungicides (Quinone outside Inhibitors)
|
|
Difenoconazole
|
Synthetic fungicide
|
2
|
BONECO, dosage: 0,5 L/ha
|
DMI-fungicides (DeMethylation Inhibitors) (SBI: Class I)
|
|
Boscalid, pyraclostrobine
|
|
3
|
BIGALO, dosage: 1 kg/ha (dissolved in min. 400 L/ha)
|
|
|
Difenoconazole, fluxapyroxad
|
|
3
|
DAGONIS, dosage: 1 L/ha (to be applied on BBCH 41 - 49)
|
|
|
Prothioconazole
|
|
3 (14 days between 2 applications
|
RUDIS, dosage: 0,4 L/ha (pre harvest delay: 21 days)
|
|
|
Fluopyrame, trifloxystrobine
|
|
1
|
LUNA SENSATION, dosage: 0,5 L/ha (to be applied n BBCH 41 - 49)
|
|
|
Trifloxystrobine, tebuconazole
|
|
2
|
NATIVO 75 WG, dosage: 0,36 kg/h, to be applied on BBCH 41 - 49, 20 m buffer zone from surface waters using technology that reduces drift by 50%.
|
|
|
Azoxystrobine, difenoconazol
|
|
2
|
ORTIVA TOP, doage: 1 L/ha, preventive application or first signs of infection
|
|
|
Tebuconazole
|
|
1
|
RIZA EC, dosage: 1,25 L/ha, to be applied on BBCH ≥ 41, 3 days before re accessing field, pre harvest delay of 35 days, buffer zone of 10m from surface water
|
|
The information made available here has been obtained from or is based upon sources believed by CABI to be reliable but is not guaranteed as to accuracy or completeness. Anyone acting or relying on such information does so entirely at their own risk. The efficacy of the IPM methods included above will depend on local conditions and might not always be suitable everywhere within the specified country.